Reorder point and safety stock calculator

Work out the stock level at which to reorder, how much safety stock you need and what a sensible order quantity is.

Example values: enter your own usage, lead time and costs. Everything is calculated in your browser.

Usage and lead time

Count the lead time in the same days. Annual demand is also calculated from this (52 weeks).

From the moment you order until the goods are on the shelf, ready to sell.

Safety stock
Calculation method

In Excel: =STDEV.S() over the daily usage of the past months.

Leave empty if your supplier almost always delivers on time.

The share of order cycles in which you do not run out of stock.

Order quantity (EOQ)

Leave empty to use 5,200 units, derived from your usage.

Time for ordering, receiving and processing invoices, plus fixed freight or order charges.

Holding costs

Result

Reorder when stock (including what is already on its way) falls to 232 units. Then order about 372 units.

Reorder point
232 units
Safety stock
32 units
Order quantity (EOQ)
372 units
Orders per year
14
Average stock
217.4 units
Time between orders
18.6 days

How this was calculated

  1. Usage during the lead time: 20 per day × 10 days = 200 units.
  2. Safety stock (statistical): z × σusage × √lead time = 1.645 × 6 × √10 = 31.2 units.
  3. Reorder point: usage during lead time + safety stock = 200 + 31.2 = 231.2, rounded up to 232 units.
  4. Economic order quantity: √(2 × annual demand × ordering cost ÷ holding cost) = √(2 × 5,200 × €40.00 ÷ €3.00) = 372.4 units. At that quantity the ordering costs (€558.57 per year) equal the holding costs of the cycle stock.
  5. Average stock: EOQ ÷ 2 + safety stock = 217.4 units, which comes to about €652.20 in holding costs per year.
Stock over time
02314040193756

Horizontal: days. Vertical: units in stock. Based on average usage; in reality the line is more erratic.

Sawtooth chart over 3 order cycles. Stock starts at 404 units (order quantity plus safety stock), falls in about 19 days to the safety stock of 31 units and is then replenished. You place the order at 231 units.

Runs entirely in your browser: what you enter is not sent to us or stored.

Calculating the reorder point: when should you reorder?

The reorder point is the stock level at which you place a new order. The idea is simple: between placing an order and receiving it, you keep selling or using stock. So you need to order while there is still just enough left to cover that lead time, plus a buffer for setbacks. As a formula: reorder point = average daily usage × lead time in days + safety stock.

How to use the calculator: 1. enter your average usage, per day or per week, and the lead time in days. Make sure you count usage and lead time in the same kind of days: if you sell five days a week and your supplier says ten working days, choose five days a week. 2. Choose how you want to calculate the safety stock. 3. Enter the costs for the order quantity. The result shows the formulas with your numbers, so you can check them or copy them into your own system.

Compare the reorder point with your inventory position, not only with what is physically on the shelf. The inventory position is the stock on hand plus what has been ordered but not yet delivered, minus what is already reserved for customers. With long lead times in particular, several orders are often open at the same time, and you end up ordering twice if you only look at the shelf.

Safety stock: simple or statistical

The simple method assumes a busy but realistic period: safety stock = maximum usage × longest lead time − average usage × average lead time. It is easy to explain and needs little data. The downside is that the result depends heavily on the maximum you choose, and you do not know how much certainty it buys you.

The statistical method uses the variability of your usage, expressed as the standard deviation per day, and a target service level. 95 percent corresponds to a z-value of 1.64, 99 percent to 2.33. Safety stock is then z × standard deviation × √lead time. If the lead time varies as well, you use the combined formula: z × √(lead time × σusage² + usage² × σlead time²). That way an unreliable supplier visibly costs you extra stock.

Service level here means the share of order cycles in which you do not run out. Going from 95 to 99 percent looks like a small step, but the safety stock rises by more than 40 percent. So set the level per item group: high for fast movers and items customers will not wait for, lower for items that are easy to deliver later.

Economic order quantity (EOQ) and its limits

The economic order quantity, also known as EOQ or the Wilson formula, answers the question of how much to order at a time. Frequent small orders cost a lot in ordering costs: time for ordering, receiving, checking and processing invoices. Large orders cost a lot in holding costs: interest on the money tied up, storage space, insurance, obsolescence and shrinkage. EOQ = √(2 × annual demand × ordering cost ÷ holding cost per unit per year) sits exactly at the point where those two types of cost are equal.

Holding costs are often expressed as a percentage of the cost price per year; a common rule of thumb is 15 to 30 percent, depending on interest, space and the risk of items becoming unsellable. Work it out for your own situation, because the EOQ is sensitive to this assumption, although less than you might think: thanks to the square root, a cost rate twice as high gives an order quantity about 30 percent smaller.

The EOQ assumes constant demand, a fixed price and unlimited shelf life. In practice you deal with volume discounts, minimum order quantities, fixed pack sizes, pallet quantities and best-before dates. So use the EOQ as a starting point: round it to a pack size, check whether a volume discount outweighs the higher holding costs, and never order more than you can sell before the best-before date.

How a WMS does this automatically

A calculation for one item is useful for understanding how it works, but a wholesaler has hundreds or thousands of items, each with its own usage, supplier and lead time. A well-configured WMS or ERP recalculates reorder points and safety stocks periodically from actual sales and receipt history, and creates purchase proposals automatically as soon as the inventory position falls below the reorder point.

In doing so, the system takes into account what makes a spreadsheet hard: seasons and trends, open purchase orders, reservations, minimum order quantities and pack sizes per supplier, and the actual lead time as it shows in the receipts. A common mistake is to set reorder points once and never adjust them, while usage and lead times change. So recalculate them at least every quarter, or let the system do it.

Frequently asked questions

Reorder point calculator: your questions answered

How do you calculate the reorder point?

Multiply the average daily usage by the lead time in days and add the safety stock. If you use 20 units a day, the lead time is 10 days and you keep 30 units of safety stock, the reorder point is 20 × 10 + 30 = 230 units.

What is the difference between reorder point and safety stock?

Safety stock is the buffer for setbacks: higher usage or a later delivery than normal. The reorder point is the level at which you order, made up of the expected usage during the lead time plus that safety stock. If everything goes to plan, the new delivery arrives when your stock is at the safety stock level.

Which service level should I choose?

That depends on what a stockout costs. For fast movers and items customers are waiting for, many businesses choose 97.5 to 99 percent; for items that are easy to deliver later, 90 to 95 percent is enough. The higher the percentage, the faster the safety stock rises.

How do I find the standard deviation of my usage?

Put the daily usage of the last three to six months in a column and use the STDEV.S function in Excel. Only include days on which you normally sell, and take out one-off large project orders, because they distort the variability.

Is the economic order quantity always the best order quantity?

No, it is a starting point. The EOQ does not account for volume discounts, minimum order quantities, pack sizes or shelf life. Round it to a practical quantity and check whether a volume discount is worth the extra holding costs.

How often should I recalculate reorder points?

At least every quarter, and always when usage, supplier or lead time clearly changes. More often for seasonal items. A WMS or ERP can do this automatically based on actual sales and receipt history.

Free tools

More free tools

All tools
  • AI readiness scan

    Answer ten questions about one process and see straight away whether AI, rule-based automation or something else is the right first step.

  • Savings calculator

    Enter how much time your team spends on manual work and get an instant estimate of the savings per year.

  • Cron expression generator

    Build a schedule or paste a cron expression and read in plain English when it runs, with the next run times.

  • JSON formatter & validator

    Paste JSON, make it readable or compact, and see exactly where an error is, by line and column. Everything stays in your browser.

  • CSV to JSON converter

    Turn a CSV export from Excel, your webshop or your accounting software into JSON for an API or import. The delimiter is detected automatically.

  • Custom software or SaaS

    Compare the cost of an off-the-shelf package with custom software over several years, using your own numbers.

  • Dutch VAT calculator

    Convert an amount from excluding to including Dutch VAT or back, at 21%, 9% or 0%, and see exactly how much VAT it contains.

  • Margin calculator

    Enter two of cost price, selling price, margin or markup and get the rest, including the difference between margin and markup and the price with VAT.

  • EAN checker

    Check whether an EAN-13, EAN-8, UPC-A or GTIN-14 is valid, calculate a missing check digit, and validate a whole list in one go.

Team talking and laughing around a laptop

Free introductory call

Curious what Kantex could automate for you?

Book a free 30-minute introductory call. We walk through your process and show where software, integrations or AI deliver the most.

  • No obligation and no sales pitch
  • Concrete opportunities for your process
  • A clear next step and quote
Four colleagues discussing a design on a laptop

Free process analysis

Find out in 30 minutes what you can automate

Together we walk through one process and show where software, integrations or AI save time. No obligation.